1. Daily inspection: bulb working status (PRX6000 and 8000). Method: Use a piece of white paper on the work area, if there is an arc-shaped shadow, change the corresponding bulb. The disinfection handle is in place. Method: Two "clicks" during installation. Cleaning: Use a weak alkaline solvent (soapy water) to wash the exterior; avoid using chlorine-containing lotion (damages metal) and alcohol lotion (damages plastics and paint).
2. Monthly inspection: mainly to check whether the backup power system (battery) is normal. Method: Cut off the 220V power supply and see if the backup power supply is activated.
3. The average bulb life is 1000 hours; for the lamp holder, it is basically replaced once a year. The premise is to use the bulb specified by the manufacturer.
4. Annual inspection: You can ask a professional manufacturer to send someone to inspect it. Replace aging parts.
Four steps of maintenance
(Performed by a certified engineer)
Tighten the power cord connector (input and output of the control box) screws at each connection brush
Adjustment, rotation limit, bulb working voltage (23V AC+DC), brake on each joint
Check the verticality of the suspension pipe and the balance of the suspension system. Whether the fastening of the screws at the joints of each part is normal. Whether the brakes are normal when the joints are in motion. Rotation limit.
Detection of the installation of the disinfection handle Illuminance Diameter of the spot






